Guanping Expressway Electromechanical EngineeringPower Distribution Project of Section №1
The Guanping Expressway is part of the national expressway network.It is a key section of G59 (Hohhot - Beihai Expressway), with a total length of 136.68 kilometers (58.88 kilometers in Guanyang section). It has been listed as a major project in the Guangxi Zhuang Autonomous Region and undertakes the function of a regional transportation hub. This project provides high - and low - voltage power distribution core equipment for the No.1 bid section of the electromechanical engineering to ensure the power safety of key facilities such as tunnels, toll stations, and service areas.
Siwu Solution
Customer Value
1. Requirement for zero power supply interruption:
▪ The tunnel lighting, ventilation, and monitoring systems need tooperate continuously 24 hours a day. A power outage may cause traffic accidents.
4.Highly intensive use of space resources
▪ The space of the tunnel distribution room is limited, and a compact equipment layout plan is required.
Power supply guarantee for critical facilities
▪ High-reliability circuit breaker+ Five-prevention system, providing power support for the safe operation of the tunnel.
Space adaptability optimization
Compact cabinet structure+ High - density wiring capacity to relieve the space pressure of the tunnel power distribution room.
2.Adaptability to harsh environments:
▪ The equipment is highly corrosive in the high - humidity and salt - fog environment in mountainous areas, and long - term protection is required.
Full - life cycle durability
Aluminum - zinc coated steel plate cabinets and maintenance - free circuit breakers reduce equipment maintenance in the humid mountain environment
3.Efficient operation and maintenance of dispersed sites:
▪ Tunnel/ Toll stations are widely distributed, and the equipment needs to support rapid fault isolation and modular replacement.
2.SWMNS Low-voltage Switchgear: A Flexible and Efficient Power Distribution Hub
− Modular Mixed Installation Design:
▪ The feeder units and motor control units can be mixed and installed in the same cabinet, suitable for diverse loads such as fans, pumps, and lighting, optimizing space utilization.
− Fully Assembled for Rapid Deployment:
▪ The profile structure supports efficient on-site assembly, ensuring the tight schedule of high-speed projects.
− Highly Compatible Intelligent Interface:
▪ Communication protocol interfaces are reserved for seamless connection with the high-speed electromechanical monitoring system.
− Enhanced Safety Protection:
▪ The user-friendly design strengthens personal and equipment protection, meeting the high reliability requirements of infrastructure.
Improvement of operation and maintenance efficiency
The design of interchangeable hand - carts shortens the fault repair time, and the modular low - voltage units simplify the maintenance process.
1.KYN28 - 12 High - voltage Switchgear: A Safe and Reliable Core Guarantee
− Military - grade Protection Structure:
▪ The cabinet is made of imported aluminum - zinc coated steel plates, which are processed byFMS multiple folding process, significantly improving the corrosion resistance and adapting to the hot and humid climate in Guangxi.
− Five - proof Interlock+ Pressure Relief Channel:
▪ The mechanical and electrical double interlock completely eliminates misoperation. The pressure relief channel ensures the safety of operation and maintenance, meeting the specifications of unattended scenarios.
− Hot - pluggable Maintenance:
▪ Equipped withZN63A - 12(VS1) Vacuum Circuit Breaker. Trolleys of the same specification can be freely interchanged, and a special carrier vehicle enables quick replacement.
− High - density Wiring Capacity:
▪ A single cabinet supports9 single - core cables, meeting the multi - circuit power supply requirements of tunnels.
|
|