Star ProductsMedium and High Voltage SwitchgearLow Voltage SwitchgearSubstationsPower Distribution BoxesAuthorized CabinetsPhotovoltaic CabinetsGas-Insulated CabinetsBuswaysComprehensive Training Building (EPC) ProjectEPC Engineering of Du'an People HospitalEPC Project of Teng County Industrial Park40.008MWp Distributed Photovoltaic ProjectPower Engineering General ContractingBYD's Phase III Power Distribution ProjectNanning Qingxiu Tesla Center Power DistributionGaoshan Operation Area Power Distribution ProjectGuida Paper 35kV Substation EngineeringIron & Steel Base Power Distribution Project10kV Power Distribution Project for Cold StorageIndustryBeitou Yinshan Power Distribution ProjectPower Distribution Project of Hezhou Binfen MallLiuzhou CR Land Power Distribution ProjectGuangxi MYJ Industry Power Distribution ProjectPower Distribution Project of Creative ParkCommercial Real EstateIndustry - Education Integration Power SupplyYao Medicine Hospital Power Distribution ProjectMuseum Power Distribution ProjectSurveying & Mapping Bureau. Power Distribution ProIntegration Training Building Power DistributionGX Agricultural Vocational and Technical UniversitNanning University Training Building Power DistribGX Agricultural Engineering Vocational and TechnicPujin Road Phase II Sewage Pipe Box-type SubstatioInfrastructureBaise Sports Center Charging Piles Power DistributNapo People's Court Charging Piles Power DistributSmart Park Charging Piles Power Distribution ProjeEnergy and PowerPower Distribution Project of Nanning Rail TransitTian'e-Beihai Highway Power Distribution ProjectGuanyang - Pingle Mechanical & Electrical EngineerTransportation1.92MW Distributed Photovoltaic Power ProjectPhotovoltaic Power Generation Project (Phase I)Agriculture, Forestry, Animal Husbandry & FisheryProjects OverviewNews CenterVideo UpdatesIndustry FAQIndustry White PaperGroup ProfileIndustrial Products Platform QiansimaiHonors and QualificationsSeeking Overseas Distributors

Guanping Expressway Electromechanical EngineeringPower Distribution Project of Section №1

The Guanping Expressway is part of the national expressway network.It is a key section of G59 (Hohhot - Beihai Expressway), with a total length of 136.68 kilometers (58.88 kilometers in Guanyang section). It has been listed as a major project in the Guangxi Zhuang Autonomous Region and undertakes the function of a regional transportation hub. This project provides high - and low - voltage power distribution core equipment for the No.1 bid section of the electromechanical engineering to ensure the power safety of key facilities such as tunnels, toll stations, and service areas.

Solution
Customer pain points

Siwu Solution

Customer Value

1. Requirement for zero power supply interruption:


▪ The tunnel lighting, ventilation, and monitoring systems need tooperate continuously 24 hours a day. A power outage may cause traffic accidents.

4.Highly intensive use of space resources


▪ The space of the tunnel distribution room is limited, and a compact equipment layout plan is required.

Power supply guarantee for critical facilities


▪ High-reliability circuit breaker+ Five-prevention system, providing power support for the safe operation of the tunnel.

Space adaptability optimization


Compact cabinet structure+ High - density wiring capacity to relieve the space pressure of the tunnel power distribution room.

2.Adaptability to harsh environments:


▪ The equipment is highly corrosive in the high - humidity and salt - fog environment in mountainous areas, and long - term protection is required.

Full - life cycle durability


Aluminum - zinc coated steel plate cabinets and maintenance - free circuit breakers reduce equipment maintenance in the humid mountain environment

3.Efficient operation and maintenance of dispersed sites:


▪ Tunnel/ Toll stations are widely distributed, and the equipment needs to support rapid fault isolation and modular replacement.

2.SWMNS Low-voltage Switchgear: A Flexible and Efficient Power Distribution Hub


− Modular Mixed Installation Design:

▪ The feeder units and motor control units can be mixed and installed in the same cabinet, suitable for diverse loads such as fans, pumps, and lighting, optimizing space utilization.

− Fully Assembled for Rapid Deployment:

▪ The profile structure supports efficient on-site assembly, ensuring the tight schedule of high-speed projects.

− Highly Compatible Intelligent Interface:

▪ Communication protocol interfaces are reserved for seamless connection with the high-speed electromechanical monitoring system.

− Enhanced Safety Protection:

▪ The user-friendly design strengthens personal and equipment protection, meeting the high reliability requirements of infrastructure.

Improvement of operation and maintenance efficiency


The design of interchangeable hand - carts shortens the fault repair time, and the modular low - voltage units simplify the maintenance process.

1.KYN28 - 12 High - voltage Switchgear: A Safe and Reliable Core Guarantee


− Military - grade Protection Structure:

▪ The cabinet is made of imported aluminum - zinc coated steel plates, which are processed byFMS multiple folding process, significantly improving the corrosion resistance and adapting to the hot and humid climate in Guangxi.

− Five - proof Interlock+ Pressure Relief Channel:

▪ The mechanical and electrical double interlock completely eliminates misoperation. The pressure relief channel ensures the safety of operation and maintenance, meeting the specifications of unattended scenarios.

− Hot - pluggable Maintenance:

▪ Equipped withZN63A - 12(VS1) Vacuum Circuit Breaker. Trolleys of the same specification can be freely interchanged, and a special carrier vehicle enables quick replacement.

− High - density Wiring Capacity:

▪ A single cabinet supports9 single - core cables, meeting the multi - circuit power supply requirements of tunnels.