The EPC project of the 40.008MWp distributed photovoltaic power generation project in Napo County, Baise City is located in Delong Township, Napo County, Guangxi. It is a typical rural distributed photovoltaic project. The project covers the whole - process EPC services such as survey and design, equipment supply, construction, grid - connected acceptance, and later operation and maintenance.
As a key device for the output confluence and protection of string inverters, the photovoltaic AC combiner box plays a core role in improving the overall reliability of the system, simplifying the structure, and ensuring the safety of operation and maintenance.
Siwu Solution
Customer value
1. Use PV AC combiner boxes to combine the AC outputs of multiple string inverters, integrate them into a small number of grid - connected nodes, optimize the system structure, and reduce the costs of cables and cabinets.
2. Configure input/output circuit breakers and AC lightning arresters to achieve dual over - current, short - circuit, and lightning strike protection for inverters and the power grid.
1. The system structure is more concise, reducing the number of grid - connected cabinets and the amount of cables, and lowering the initial investment and installation complexity.
2. It enhances the system reliability, effectively protects against lightning strikes and electrical faults, and extends the service life of key equipment such as inverters.
3. Improve operation and maintenance efficiency. The real - time data monitoring and fault location functions help for quick response and reduce power generation losses.
4. Maintenance operations are safer. As a physical disconnection point, the combiner box effectively ensures the safety of personnel and equipment.
3. An intelligent electricity meter and monitoring module can be optionally configured to monitor parameters such as current, voltage, and power generation in real - time, and support remote operation and maintenance and fault early warning.
4. A local mechanical disconnection point is provided for easy safety isolation, ensuring the operational safety of maintenance personnel and complying with electrical safety regulations.
1. There are a large number of string inverters with dispersed outputs. Direct grid - connection results in too many access points, making the system structure complex, with high costs and being unfavorable for management.
2.The system lacks a centralized monitoring and protection mechanism. When a fault occurs, it is difficult to troubleshoot, which affects the power generation efficiency and the operation and maintenance response speed.
3. Thunderstorm weather is common in rural areas. The AC side is prone to being affected by lightning over - voltage, which threatens the safety of inverters and power grid equipment.
4. When performing daily maintenance or emergency power outages, there is a lack of local rapid disconnection devices, posing operational risks.
|
|