Star ProductsMedium and High Voltage SwitchgearLow Voltage SwitchgearSubstationsPower Distribution BoxesAuthorized CabinetsPhotovoltaic CabinetsGas-Insulated CabinetsBuswaysComprehensive Training Building (EPC) ProjectEPC Engineering of Du'an People HospitalEPC Project of Teng County Industrial Park40.008MWp Distributed Photovoltaic ProjectPower Engineering General ContractingBYD's Phase III Power Distribution ProjectNanning Qingxiu Tesla Center Power DistributionGaoshan Operation Area Power Distribution ProjectGuida Paper 35kV Substation EngineeringIron & Steel Base Power Distribution Project10kV Power Distribution Project for Cold StorageIndustryBeitou Yinshan Power Distribution ProjectPower Distribution Project of Hezhou Binfen MallLiuzhou CR Land Power Distribution ProjectGuangxi MYJ Industry Power Distribution ProjectPower Distribution Project of Creative ParkCommercial Real EstateIndustry - Education Integration Power SupplyYao Medicine Hospital Power Distribution ProjectMuseum Power Distribution ProjectSurveying & Mapping Bureau. Power Distribution ProIntegration Training Building Power DistributionGX Agricultural Vocational and Technical UniversitNanning University Training Building Power DistribGX Agricultural Engineering Vocational and TechnicPujin Road Phase II Sewage Pipe Box-type SubstatioInfrastructureBaise Sports Center Charging Piles Power DistributNapo People's Court Charging Piles Power DistributSmart Park Charging Piles Power Distribution ProjeEnergy and PowerPower Distribution Project of Nanning Rail TransitTian'e-Beihai Highway Power Distribution ProjectGuanyang - Pingle Mechanical & Electrical EngineerTransportation1.92MW Distributed Photovoltaic Power ProjectPhotovoltaic Power Generation Project (Phase I)Agriculture, Forestry, Animal Husbandry & FisheryProjects OverviewNews CenterVideo UpdatesIndustry FAQIndustry White PaperGroup ProfileIndustrial Products Platform QiansimaiHonors and QualificationsSeeking Overseas Distributors

The first - phase quality improvement and renovation project of Tengxian Industrial Park(EPC) General Contracting Project

Tengxian Industrial Park is located in Wuzhou City, Guangxi. It is one of the key industrial agglomeration areas developed by the autonomous region, mainly focusing on industries such as building materials, chemicals, and light - manufacturing. As the scale of enterprises in the park expands and the electricity demand increases, the original power distribution system has problems such as aging equipment, insufficient power supply reliability, and low intelligence level. There is an urgent need to upgrade and transform the power infrastructure to support the sustainable development of the park and the high - quality electricity demand of enterprises.


The first phase of the upgrading and transformation project of Tengxian Industrial Park this time(EPC) general contracting project aims to comprehensively upgrade the power distribution system in the core area of the park. It uses complete switchgear with stable performance and mature technology to improve the reliability of power grid operation and the level of energy - efficiency management.

Solution
Customer pain points

Siwu Solution

Customer Value

1.The high - voltage system adoptsKYN28 - 12 type armored removable metal - enclosed switchgear, which has high breaking capacity, strong insulation performance and modular structure. It supports rapid fault isolation and maintenance, ensuring the reliability of the high - voltage power supply section;

2.Low-voltage system configurationThe combination scheme of GCS/GCL type draw-out switchgear and GCK fixed-separated switchgear improves the flexibility of the power feeding and control circuits, and supports modular expansion and intelligent monitoring;

1. Improve the overall reliability of the park's power grid, reduce the risk of power outages, and ensure the continuous production and operation of enterprises.


2. The modular and draw-out design of the equipment significantly improves the operation and maintenance efficiency and shortens the fault handling time.


3. Optimize the power quality, achieve local reactive power balance, and it is expected to achieve a certain proportion of energy-saving effects;


4. The system has good scalability and can support the future load growth and intelligent upgrade needs of the park.

3.The reactive power compensation capacity is insufficient, resulting in relatively large power losses and relatively high electricity costs;

3. The system integrates reactive power compensation and power management functions to improve the power factor and reduce line losses;





4. All devices comply with national andIEC standards, featuring five - proof interlocking, high breaking capacity, and good dynamic and thermal stability, suitable for the complex power - using environment in industrial parks.


1. The original power distribution equipment has been in operation for a relatively long time, with a relatively high failure rate, which affects the continuous production of enterprises in the park.



4. The operation and maintenance of the low-voltage draw-out switchgear lack convenience, and the scope of influence during maintenance is large.



2. The flexibility of the power supply system is insufficient, making it difficult to meet the needs of enterprise production expansion and load changes;