Star ProductsMedium and High Voltage SwitchgearLow Voltage SwitchgearSubstationsPower Distribution BoxesAuthorized CabinetsPhotovoltaic CabinetsGas-Insulated CabinetsBuswaysComprehensive Training Building (EPC) ProjectEPC Engineering of Du'an People HospitalEPC Project of Teng County Industrial Park40.008MWp Distributed Photovoltaic ProjectPower Engineering General ContractingBYD's Phase III Power Distribution ProjectNanning Qingxiu Tesla Center Power DistributionGaoshan Operation Area Power Distribution ProjectGuida Paper 35kV Substation EngineeringIron & Steel Base Power Distribution Project10kV Power Distribution Project for Cold StorageIndustryBeitou Yinshan Power Distribution ProjectPower Distribution Project of Hezhou Binfen MallLiuzhou CR Land Power Distribution ProjectGuangxi MYJ Industry Power Distribution ProjectPower Distribution Project of Creative ParkCommercial Real EstateIndustry - Education Integration Power SupplyYao Medicine Hospital Power Distribution ProjectMuseum Power Distribution ProjectSurveying & Mapping Bureau. Power Distribution ProIntegration Training Building Power DistributionGX Agricultural Vocational and Technical UniversitNanning University Training Building Power DistribGX Agricultural Engineering Vocational and TechnicPujin Road Phase II Sewage Pipe Box-type SubstatioInfrastructureBaise Sports Center Charging Piles Power DistributNapo People's Court Charging Piles Power DistributSmart Park Charging Piles Power Distribution ProjeEnergy and PowerPower Distribution Project of Nanning Rail TransitTian'e-Beihai Highway Power Distribution ProjectGuanyang - Pingle Mechanical & Electrical EngineerTransportation1.92MW Distributed Photovoltaic Power ProjectPhotovoltaic Power Generation Project (Phase I)Agriculture, Forestry, Animal Husbandry & FisheryProjects OverviewNews CenterVideo UpdatesIndustry FAQIndustry White PaperGroup ProfileIndustrial Products Platform QiansimaiHonors and QualificationsSeeking Overseas Distributors
Share to:

Power prefabricated cabin

The prefabricated cabin is a new type of construction method. Usually, the box body fabrication, relevant wiring, installation and commissioning of secondary equipment are completed in the factory. Then, it is transported as a whole to the construction site and directly connected with primary equipment and civil engineering, which is a standard workshop convenient for loading, unloading, transportation and equipment operation and maintenance in various ways. The application scenarios of prefabricated cabins include shopping malls, residential power distribution, new energy, etc. In the field of new energy applications, photovoltaic power generation is one of the important application scenarios of prefabricated cabin substations. The prefabricated cabin is a large - scale box - type substation that integrates the advantages of the box - type transformer's "prefabrication".
Product Description
Specification

1. Core advantages:

Rapid deployment: Factory pre-installation and commissioning, shortening the on-site construction period by more than 70%;

Full environment adaptation: IP43 protection grade, suitable for harsh environments with temperatures of -40°C to +50°C and humidity ≤95%;

Long life design: The service life of the main structure is ≥20 years, and the anti-corrosion performance is up to 40 years without rust.

2. Structural design

A. Cabin structure

  • frame: High-quality carbon structural steel (yield strength ≥ 235MPa), welded chassis steel, overall earthquake resistance and deformation resistance;

  • Top cover: 5% slope roof design + drip edge to prevent water and snow accumulation;

  • Door: Outward opening door (net width ≥ 0.9m), equipped with "push-bar" emergency escape lock and pressure relief function (dedicated to battery compartment)。

B. Internal layout

  • Partitioned compartments: Steel plates and flame-retardant partitions separate equipment areas, corridors, and cable areas;

  • Cable channel:

    • Primary cable: Double-layer galvanized fireproof trough (Class A fire resistance)

    • Secondary cable: Metal shielding trough (anti-electromagnetic interference);

  • floor: 50mm insulation rubber sheet + bottom wiring interlayer (applicable to battery compartment)。

3. Safety and protection system

A. Fire and explosion prevention

  • Battery compartment dedicated: pressure relief door lock linked to combustible gas detector, forced ventilation to prevent airflow short circuit;

  • General requirements: Automatically cut off air conditioning/ventilation and start mechanical smoke exhaust in case of fire (in accordance with GB50016)。

B. Grounding and lightning protection

  • The overall grounding device (including non-electrical parts) has a conspicuous grounding mark;

  • The cable entrance adopts sealing rubber ring + fireproof sealing (GB23864-2009)。

C. Emergency measures

  • Emergency escape door lock + sound and light exit indication;

  • Explosion-proof lighting switch (battery compartment)

4. Installation and Operation and Maintenance

A. Transportation and installation

  • During transportation, the cabinet should be equipped with a movable fixing frame to prevent displacement damage;

  • The bottom of the cabin is equipped with a pre-set cable trench entry hole (≥600mm×600mm), and the cover is hinged and fixed。

B. Operation and maintenance requirements

  • daily: Clean the dust screen and check the sealing strip (replace every 5 years);

  • Maintenance:Corridor width ≥ 0.9m, lighting supports full cabin power off maintenance.

1. Internal standard configuration

System TypeConfiguration List



Power supply and distribution system

Distribution box (including HM1 opening), socket, emergency power supply

Environmental Control

Industrial air conditioning (remote fault alarm), dual exhaust system (explosion-proof, air volume ≥ cabin volume/minute)

Lighting system

LED tri-proof lights (illuminance ≥ 300lx), emergency lighting (automatic power-off start)

Safety protection

Smoke alarms, fire detection systems, portable fire extinguishers, access control systems

Intelligent

Temperature and humidity sensors, remote monitoring cameras (front and back of the cabinet), intelligent auxiliary control platform