Star ProductsMedium and High Voltage SwitchgearLow Voltage SwitchgearSubstationsPower Distribution BoxesAuthorized CabinetsPhotovoltaic CabinetsGas-Insulated CabinetsBuswaysComprehensive Training Building (EPC) ProjectEPC Engineering of Du'an People HospitalEPC Project of Teng County Industrial Park40.008MWp Distributed Photovoltaic ProjectPower Engineering General ContractingBYD's Phase III Power Distribution ProjectNanning Qingxiu Tesla Center Power DistributionGaoshan Operation Area Power Distribution ProjectGuida Paper 35kV Substation EngineeringIron & Steel Base Power Distribution Project10kV Power Distribution Project for Cold StorageIndustryBeitou Yinshan Power Distribution ProjectPower Distribution Project of Hezhou Binfen MallLiuzhou CR Land Power Distribution ProjectGuangxi MYJ Industry Power Distribution ProjectPower Distribution Project of Creative ParkCommercial Real EstateIndustry - Education Integration Power SupplyYao Medicine Hospital Power Distribution ProjectMuseum Power Distribution ProjectSurveying & Mapping Bureau. Power Distribution ProIntegration Training Building Power DistributionGX Agricultural Vocational and Technical UniversitNanning University Training Building Power DistribGX Agricultural Engineering Vocational and TechnicPujin Road Phase II Sewage Pipe Box-type SubstatioInfrastructureBaise Sports Center Charging Piles Power DistributNapo People's Court Charging Piles Power DistributSmart Park Charging Piles Power Distribution ProjeEnergy and PowerPower Distribution Project of Nanning Rail TransitTian'e-Beihai Highway Power Distribution ProjectGuanyang - Pingle Mechanical & Electrical EngineerTransportation1.92MW Distributed Photovoltaic Power ProjectPhotovoltaic Power Generation Project (Phase I)Agriculture, Forestry, Animal Husbandry & FisheryProjects OverviewNews CenterVideo UpdatesIndustry FAQIndustry White PaperGroup ProfileIndustrial Products Platform QiansimaiHonors and QualificationsSeeking Overseas Distributors

桂达纸业35kV变电站工程

宾阳桂达纸业工厂位于南宁市宾阳县农民工创业园内,需建设一座满足造纸生产高可靠性供电的35kV变电站。项目要求2025年5月交付,核心需求包括:


1. 主变容量9250kVA(4000kVA×2 + 1250kVA×1)

2. 配套35kV高压柜5台、400V低压柜20台及二次安防系统

3. 适应工业园区的温湿度环境(日平均湿度≤95%)


解决方案
客户痛点

方案主张

客户价值

1. 供电可靠性要求高


造纸生产线需持续稳定供电,传统配电设备分断能力不足存在风险。

1. 安全可靠运行

− 高压柜机械联锁杜绝误操作,低压柜50kA高分段能力保障电网稳定性

− 母线夹阻燃等级V0(PPO材料),降低短路起火风险

2. 空间与工期紧张


园区现有配电室空间有限,需快速部署且满足未来扩容需求。

2. 全生命周期成本优化

− 模块化结构支持后期快速扩容(如1250kVA主变增容需求)。

− 柜门转轴铰链 + 山型橡塑条设计,防护等级达IP30,减少维护频次。

3. 环境适应性挑战


南宁高温高湿环境(日平均湿度95%)易引发电气设备凝露、腐蚀。

3.关键技术设计


环境适应性:

− 低压柜底部散热槽孔设计,形成自下而上风道(-15℃~40℃温宽)

− 高压柜复合绝缘母线 + 阻燃绝缘套,防潮防凝露

高效交付:

− SWGGD柜体C型材模块化预生产,缩短30%安装周期

− 通用柜20模数安装孔,兼容DW45/CW1等主流元件

3、高效交付保障生产

− 2025年5月24日按期投运,支持桂达纸业生产线准时启动。

针对痛点提供定制化变电站解决方案

1. 核心设备选型

高压系统:采用 KYN61-40.5铠装移开式开关柜

- 柜体覆铝锌板组装,防护等级 IP4X(防尘防溅水)

- 丝杆传动手车机构 + 机械闭锁设计,满足“五防”安全标准(GB3906/DL/T404)


2. 低压系统:配置 SWGGD型固定式开关柜


- 额定电流6300A,短时耐受电流50kA(符合GB7251.12标准)

- 专用ZMJ母线夹(PPO阻燃材料)提升动稳定性