Star ProductsMedium and High Voltage SwitchgearLow Voltage SwitchgearSubstationsPower Distribution BoxesAuthorized CabinetsPhotovoltaic CabinetsGas-Insulated CabinetsBuswaysComprehensive Training Building (EPC) ProjectEPC Engineering of Du'an People HospitalEPC Project of Teng County Industrial Park40.008MWp Distributed Photovoltaic ProjectPower Engineering General ContractingBYD's Phase III Power Distribution ProjectNanning Qingxiu Tesla Center Power DistributionGaoshan Operation Area Power Distribution ProjectGuida Paper 35kV Substation EngineeringIron & Steel Base Power Distribution Project10kV Power Distribution Project for Cold StorageIndustryBeitou Yinshan Power Distribution ProjectPower Distribution Project of Hezhou Binfen MallLiuzhou CR Land Power Distribution ProjectGuangxi MYJ Industry Power Distribution ProjectPower Distribution Project of Creative ParkCommercial Real EstateIndustry - Education Integration Power SupplyYao Medicine Hospital Power Distribution ProjectMuseum Power Distribution ProjectSurveying & Mapping Bureau. Power Distribution ProIntegration Training Building Power DistributionGX Agricultural Vocational and Technical UniversitNanning University Training Building Power DistribGX Agricultural Engineering Vocational and TechnicPujin Road Phase II Sewage Pipe Box-type SubstatioInfrastructureBaise Sports Center Charging Piles Power DistributNapo People's Court Charging Piles Power DistributSmart Park Charging Piles Power Distribution ProjeEnergy and PowerPower Distribution Project of Nanning Rail TransitTian'e-Beihai Highway Power Distribution ProjectGuanyang - Pingle Mechanical & Electrical EngineerTransportation1.92MW Distributed Photovoltaic Power ProjectPhotovoltaic Power Generation Project (Phase I)Agriculture, Forestry, Animal Husbandry & FisheryProjects OverviewNews CenterVideo UpdatesIndustry FAQIndustry White PaperGroup ProfileIndustrial Products Platform QiansimaiHonors and QualificationsSeeking Overseas Distributors
Overview
Solutions
Related Products
Success Stories

Nanning Rail Transit General Contract of EPC for Phase I of Xincun Parking Lot Project of Line 3

No information available

Solution
Customer pain points

Scheme advocates

Customer value

1. Equipment selection


Trinity design:Integrated high-voltage cabinet (optional vacuum circuit breaker), transformer (S11 oil-immersed type), low-voltage cabinet (intelligent circuit breaker), reducing on-site assembly steps.


Environmental adaptability:

▶ Honeycomb double-layer composite shell (cold-rolled steel plate substrate), with a protection level of IP54;

▶ The high-voltage chamber is equipped with a temperature and humidity sensor (with the function expansion ability of "assembling a distribution network automation terminal" according to the instruction manual).

Expansion compatibility:Reserved slot for distribution network automation terminal (FTU), supporting future upgrades.

Space intensification:The outdoor deployment of box - type substations eliminates the need for the construction of independent power distribution rooms.


Essential safety improvement:

− The touchable cable heads in the switchgear eliminate the risk of electric shock;

− The five - prevention interlock of the KYN28 cabinet body prevents misoperation.

Optimization of operation and maintenance efficiency:

− Remote monitoring of the box - transformer status reduces on - site inspections;

− The handcart structure of the switchgear shortens the equipment maintenance time.


Sustainable expansion:The multi - circuit design of the switchgear station reserves the capacity for load expansion.

2. Delivery process optimization


Factory pre - installation and debugging:The internal wiring of the box - transformer is completed before leaving the factory, reducing on - site working hours;

Parallel construction:The equipment foundation and cable laying are advanced simultaneously.

1. The construction period is extremely short


The construction cycle of a conventional substation requires1 - 2 months, but the teaching schedule requires delivery within 15 days.

2. Space is limited


The device is placed outdoors, so outdoor compact devices are required;

3. Environmental challenges


High - humidity environments can easily cause condensation on electrical equipment and reduce insulation.

Related products
View More >
Successful cases
General Contract (EPC) for the Supporting Service Project (Phase I, Area F) of the Comprehensive Environmental Improvement Project of Xinxu River in Nanning City (Section 1)
The construction project of the overall relocation (Phase II) of Du'an Yao Autonomous County People's Hospital
Start Business Consultation