The relocation project of poles #31 - #37 of the 35kV Liangyonghe Line involved in the PPP project (Phase II) of the Port - related New Materials Industrial Park in Liujing Industrial Park
This project is the core project of the second phase of Nanning Industrial Investment Automobile Yongning Industrial Park, coveringNo. 1, No. 2, and No. 3 standard factory buildings, comprehensive station buildings, sewage treatment stations, oil supply stations, and factory roads, etc. The total construction area reaches 163,385 square meters. The focus of this project is to provide reliable high - and low - voltage power distribution core equipment for the BYD factory building to ensure the stability and safety of its production electricity consumption.
As a large - scale modern production base, the BYD factory building has extremely high requirements for the continuity, stability, and safety of power supply in its production lines. Any power interruption or fluctuation may lead to significant production losses. TheKYN28 - 12 high - voltage cabinets and SWGCS low - voltage cabinets applied in this project are precisely designed and deployed to meet the strict electricity consumption requirements of such high - end industrial factory buildings.
The plan advocates
Customer value
1. High - corrosion environment
− In the coastal area, salt - fog corrosion occurs, and ordinary metal boxes are prone to rust.
1. LongService life anti - corrosion:
Stainless steel box body+ Hot - dipped galvanized internal parts, resistant to the salt - fog environment near the sea.
4.Flexible installation
Pole - mounted deployment saves ground space.
2. Outdoor protection needs
− Facing rainfall and humid climate, designs for preventing water seepage are required.
2.Reliable protection
IP54 rating + sealing strips to prevent rainwater from seeping in.
3. Operational and maintenance security
- The living area needs to prevent electricity theft and ensure the convenience of maintenance.
2. Single - door protection design
− The door frame is inlaid with high - elasticity and aging - resistant sealing strips;
− Double door locks (visible and hidden)+ Rain shield design;
− Protection level:IP54 (complies with GB/T 4208).
− Safety and functionality
− The metering room is fully enclosed with a lead - sealing device;
− Bottom ventilation holes+ Top wire mesh dust - proof structure;
− Supports vertical/ Horizontal installation.
− Compact deployment
− Pole - mounted installation suitable for power poles (functions are clearly stated in the manual).
3. Anti-theft design
The sealed metering room reduces the risk of electricity theft.
−The pipelines in the plant area are dense, and compact equipment is required.
Technical characteristics of JXF distribution box
1. Anti - corrosion structure
− Box body:2mm stainless steel plate formed by multiple bending (or honeycomb stainless steel composite plate);
− Internal mounting beams: Treated with hot - dip galvanizing process.
|
|