The important protection project in Wuxuan District of Datengxia Water Conservancy Project
This project is the core project of the second - phase of Nanning Industrial Investment Automobile Yongning Industrial Park, coveringNo. 1, No. 2, and No. 3 standard workshops, comprehensive station buildings, sewage treatment stations, oil supply stations, and factory roads, etc. The total construction area reaches 163,385 square meters. The focus of this project is to provide reliable high - and low - voltage power distribution core equipment for the BYD workshop to ensure the stability and safety of its production power supply.
As a large - scale modern production base, the BYD workshop has extremely high requirements for the continuity, stability, and safety of power supply. Any power interruption or fluctuation may lead to significant production losses. In this project, theKYN28 - 12 high - voltage cabinets and SWGCS low - voltage cabinets are designed and deployed precisely to meet the stringent power consumption requirements of such high - end industrial workshops.
Scheme advocates
Customer value
1. After the Pinglu Canal is opened to navigation, the cargo throughput will increase significantly. The existing power distribution capacity is insufficient and it is difficult to support the new large - scale loading and unloading equipment and supporting loads such as cold storage and warehousing;
l High - standard power distribution facilities effectively guarantee the high - load and continuous operation needs of the port after the operation of the Pinglu Canal, and support the growth of throughput;
l Improve power supply reliability and power quality, and provide stable power for port automation equipment (such as remotely - controlled cranes and electric trucks);
l Enhance the port's green energy utilization capacity to lay a foundation for subsequent participation in green electricity trading and carbon emission reduction demonstration projects.
2. The port operating environment is humid and has strong salt - fog corrosion. Electrical equipment needs to have high protection and anti - corrosion capabilities;
l The high - protection design of the equipment and the intelligent operation and maintenance function significantly reduce the failure rate in the salt - fog and humid environment, and reduce the maintenance frequency and cost;
l The SWXL - 21 power distribution cabinet is specially treated for enhanced protection against the humid and salt - fog environment in the port area (such as anti - corrosion coating and IP54 protection level), and is used for power distribution at the quay and yard.
l The system has scalability and intelligent interfaces, meeting the long - term development needs of Liujing Port as a hub of the New International Land - Sea Trade Corridor in the western region;
4. The multimodal transport business requiresUninterrupted power supply 24/7. Currently, the power supply reliability and redundancy of the system are insufficient, posing a risk of operational interruption;
5.The berth expansion in the alpine operation area (such as4 berths for 3000 - ton bulk cargo) requires the power distribution system to have modular expansion capabilities.
l SelectChoose the KYN28 - 12 type central - installed switchgear as the core of the high - voltage incoming line. It has high breaking capacity and strong anti - disturbance ability, ensuring the stability of the power grid under the load growth brought by the Pinglu Canal;
l The SWGCS-type low-voltage draw-out switchgear adopts a modular design, supporting flexible expansion to meet the future power supply needs of new equipment such as gantry cranes and electric reach stackers in the port's container yards.
|
|