Guoneng Guangtou Beihai Power Plant Distribution Project
This project is the core project of the second phase of Nanning Industrial Investment Automobile Yongning Industrial Park, coveringNo. 1, No. 2, and No. 3 standard workshops, comprehensive station buildings, sewage treatment stations, oil supply stations, and factory roads, etc. The total construction area reaches 163,385 square meters. The focus of this project is to provide reliable high - and low - voltage power distribution core equipment for BYD's workshops to ensure the stability and safety of its production electricity consumption.
As a large - scale modern production base, BYD's workshops have extremely high requirements for the continuity, stability, and safety of power supply. Any power interruption or fluctuation may lead to significant production losses. In this project,the KYN28 - 12 high - voltage switchgear and SWGCS low - voltage switchgear are designed and deployed precisely to meet the strict electricity consumption requirements of such high - end industrial workshops.
The plan advocates
Customer value
1. Equipment selection
Trinity design:Integrated high-voltage cabinet (optional vacuum circuit breaker), transformer (S11 oil-immersed type), low-voltage cabinet (intelligent circuit breaker), reducing on-site assembly steps.
Environmental adaptability:
▶ Honeycomb double-layer composite shell (cold-rolled steel plate substrate), with a protection level of IP54;
▶ The high-voltage chamber is equipped with a temperature and humidity sensor (with the function expansion ability of "installing a distribution network automation terminal" according to the instruction manual).
Expansion compatibility:Reserved slots for distribution network automation terminals (FTU), supporting future upgrades.
Space intensification:The outdoor deployment of box - type substations eliminates the need for the construction of independent power distribution rooms.
Essential safety improvement:
− The touchable cable heads in switchgear stations eliminate the risk of electric shock;
− The five - proof interlocking of KYN28 cabinets prevents misoperation.
Optimization of operation and maintenance efficiency:
− Remote monitoring of the box - transformer status reduces on - site inspections;
− The handcart structure of the switchgear shortens the equipment maintenance time.
Sustainable expansion:The multi - circuit design of the switchgear station reserves the capacity for load expansion.
2. Delivery process optimization
Factory pre - installation and debugging:The internal wiring of the box - type substation is completed before leaving the factory, reducing on - site working hours;
Parallel construction:The equipment foundation and cable laying are advanced simultaneously.
1. The construction period is extremely short
The construction cycle of a conventional substation requires1 - 2 months, but the teaching schedule requires delivery within 15 days.
2. Space is limited
The device is placed outdoors, so an outdoor compact device is required;
3. Environmental challenges
High humidity environments can easily cause condensation on electrical equipment and reduce insulation.
|
|