Live-line work on distribution networks plays a crucial role in ensuring the stability and reliability of power supply. In distribution engineering projects, live-line work enables maintenance and repair of the distribution network without interrupting power supply, minimizing the impact on users' electricity consumption. However, live-line work requires strict operating procedures, meticulous operational techniques, high-level tools and personnel qualifications, and extremely high safety standards. A problem in any one环节 (link/step) will inevitably lead to risks during the operation. Therefore, risk assessment for live-line work is an indispensable part of distribution engineering projects.
According to the "10kV Distribution Network Live-Line Work Specification" issued by the State Grid Corporation of China in 2016, live-line work refers to maintenance work performed on equipment using various methods to ensure uninterrupted or short-term power outages for users. Live-line work is categorized into indirect and direct work based on the relative position of the worker and the live conductor; it can also be classified according to the insulated tools used, such as insulated rod work, insulated glove work, and combined live-line work; and it can be further distinguished between live-line work on overhead lines and cables. Different work methods carry different risks.
Live-line work on 10kV distribution lines is characterized by strict operating procedures, meticulous techniques, high requirements for tools and equipment, stringent personnel qualifications, and extremely high safety standards. For example, when using insulated poles, there are strict requirements regarding the insulation performance and length of the poles; operators need to undergo professional training and possess proficient operating skills and extensive experience. Problems in any环节 (link/step) can potentially increase the operational risks.
In live-line power distribution work, operational safety is the primary consideration. Any mistake during the work process can lead to a safety accident. For example, a decline in the insulation performance of insulating tools or improper operation by workers can both cause electric shock accidents. In addition, the complexity of the working environment, such as severe weather conditions and complex terrain, also increases the safety risks.
Poor daily management is also a significant factor contributing to increased risks during live-line work on power distribution networks. For example, inadequate management of tools and equipment can lead to damage or loss, affecting the normal progress of the work; insufficient personnel training, resulting in workers being unfamiliar with work procedures and safety regulations, can also easily lead to errors during the work process.
Different working methods also affect the risks of live-line work on power distribution networks. For example, compared to direct work, indirect work involves a greater distance between the worker and the live conductor, resulting in a relatively lower safety risk; however, indirect work requires more sophisticated tools and is more difficult to operate. While comprehensive live-line work methods can improve work efficiency, the process is more complex and requires close coordination between each step. If a problem occurs in any step, the entire operation may fail.
An optimization method for live-line work in distribution networks based on a strategy library and weight evaluation requires environmental and accessibility assessments of the work site, as well as the identification of risk points. The environmental assessment includes evaluating weather conditions, topography, and the surrounding environment; the accessibility assessment evaluates whether personnel and tools can easily reach the work site. Through a comprehensive assessment of the work site, potential risks can be identified promptly, and corresponding preventative measures can be taken.
When calculating the application risks of live-line working (LLM) technology, it is necessary to determine the sub-states of the new distribution network operating conditions that have been eliminated based on the application effectiveness of the technology. The sub-states that cannot be eliminated by LLM technology constitute the LLM technology risk application state set. Then, based on the local power supply company's operation and maintenance capabilities, the degree to which LLM technology reduces the failure time and maintenance time of each component is determined, along with the probability of each component's operation and shutdown occurring after the application of LLM technology. The probabilities of the sub-states in the LLM technology application state set are then calculated. Simultaneously, the severity of load loss and voltage limit exceedance is calculated for each load point, and the severity of overload is calculated for each component. Based on the probabilities of the sub-states in the LLM technology application state set, the severity of load loss, overload, and voltage limit exceedance, the load loss risk and voltage limit exceedance risk for each load point, and the overload risk for each component, are calculated. Finally, the risks of load loss and voltage exceedance at each load point, as well as the risks of overload at each component, are summed up to form the overall risks of load loss, overload, and voltage exceedance in the application of live-line working technology.
Based on the risk assessment results, standardized operating procedures are matched from a pre-established strategy library. The impact of risk points on operational safety is assessed using real-time environmental data, and the workflow of the standardized operating procedures is adjusted to obtain optimized operating plans. By dynamically adjusting the operating plans, they can cope with unexpected working conditions during operations and effectively avoid accident risks. For example, in the event of severe weather conditions, the operating time or method can be adjusted promptly to ensure operational safety.
Strengthening the training of operators is an important measure to reduce the risks of live-line work on power distribution networks. Regular training can improve operators' professional skills and safety awareness, ensuring they are familiar with work procedures and safety regulations. Simultaneously, conducting simulation exercises and other activities can allow operators to accumulate experience in practice and improve their ability to respond to emergencies.
Improving the management of tools and equipment is also key to reducing risks. Establish and improve tool and equipment management systems, strengthening the management of all aspects of tool and equipment procurement, acceptance, storage, use, and maintenance. Regularly inspect and test tools and equipment to ensure their good performance. For example, conduct regular insulation performance tests on insulating tools to promptly identify and replace substandard tools and equipment.
By conducting risk assessments for live-line work on distribution networks and implementing corresponding risk control measures, operational risks can be effectively reduced, ensuring the smooth progress of live-line work and thus improving power supply reliability. For example, in distribution engineering projects, the use of live-line work technology allows for equipment maintenance and repair without interrupting power supply, reducing downtime and improving user satisfaction.
Risk assessment can promptly identify potential risks during live-line work on power distribution networks and enable corresponding preventative measures, thereby ensuring the safety of workers and the safe operation of equipment. For example, conducting a comprehensive risk assessment of the work site before commencement of work and developing detailed safety measures can effectively prevent accidents from occurring.
Reasonable risk assessment and effective risk control measures can ensure the smooth implementation of live-line work in power distribution projects, improving project quality and efficiency. For example, in power distribution projects, by conducting risk assessments for live-line work and selecting appropriate work methods and times, the impact of work on project schedule can be reduced, ensuring timely project completion.
In conclusion, risk assessment for live-line work in distribution networks is of great significance in distribution engineering projects. By conducting a comprehensive and in-depth assessment of the risks associated with live-line work and implementing effective risk control measures, power supply reliability can be improved, operational safety can be ensured, and the smooth implementation of distribution engineering projects can be facilitated. In future distribution engineering projects, risk assessment for live-line work should be further strengthened, and risk assessment methods and risk control measures should be continuously improved to provide strong support for the development of the power industry.
|
|